Updating 590km Environmental and Social Impact Study for Ethiopia-Somalia Electricity Transmission Line Interconnections
Name of Client:
Eastern Africa Power Pool | Government of Ethiopia | Government of Somalia
Country:
Ethiopia and Somalia
Year:
2023 – 2024
Project Description:
The Government of Ethiopia (GOE) and the Government of Sudan (GOS) represented by their respective utility companies, i.e., the Ethiopian Electric Power (EEP) and the Somalia Electricity Transmission Company Ltd. (SETCO), have set up a Joint Technical Committee (JTC) in 2016 for the management of the Extra High Voltage (EHV) Interconnection between Ethiopia and Sudan (the Project). The proposed 590 km long interconnector extends from the Guba substation in southwestern Ethiopia (about 15 km to the border with Sudan) to the New Jabal Aulia substation (near Khartoum) via New Rabak with a power carrying capacity of up to 3,000 MW.
Description of Actual Services Provided by Your Staff Within the Assignment:
EMC Consultants Limited conducted the ESIA for the proposed project
How Can We Help You?
Get in touch with us on how we can help your organization meet its needs in environmental consultation.
Address
Nachu Plaza, 13th Floor Right Wing,
Kiambere Road, Upper Hill, Nairobi.
Telephone
+254 722 579 272
+254 207 860 293
info@emconsultants.org
Terms and Conditions
Privacy Notice
Cookie Notice
Sitemap