Updating 590km Environmental and Social Impact Study for Ethiopia-Somalia Electricity Transmission Line Interconnections

Name of Client:

Eastern Africa Power Pool | Government of Ethiopia | Government of Somalia

Country:

Ethiopia and Somalia

Year:

2023 – 2024

Project Description:

The Government of Ethiopia (GOE) and the Government of Sudan (GOS) represented by their respective utility companies, i.e., the Ethiopian Electric Power (EEP) and the Somalia Electricity Transmission Company Ltd. (SETCO), have set up a Joint Technical Committee (JTC) in 2016 for the management of the Extra High Voltage (EHV) Interconnection between Ethiopia and Sudan (the Project).  The proposed 590 km long interconnector extends from the Guba substation in southwestern Ethiopia (about 15 km to the border with Sudan) to the New Jabal Aulia substation (near Khartoum) via New Rabak with a power carrying capacity of up to 3,000 MW.

 Description of Actual Services Provided by Your Staff Within the Assignment:

EMC Consultants Limited conducted the ESIA for the proposed project

How Can We Help You?

Get in touch with us on how we can help your organization meet its needs in environmental consultation.

Address

Shelter Afrique Centre,
Longonot Road,
Upperhill, Nairobi, Kenya

Telephone

+254 722 57 92 72
+254 020 440 6162

Email

info@emconsultants.org 

EMC Consultants

Terms and Conditions

Privacy Notice

Cookie Notice

Sitemap